Electronic Thesis and Dissertations UNSYIAH - Baca Tugas Akhir
<< Previous | Home | Next >>

Search :
Advance

Ida Fithri. OPTIMALISASI LOAD IN DAN LOAD OUT COAL HANDLING FACILITY (CHF) 3 SITE BANKO BARAT DI PT BUKIT ASAM, TBK., TANJUNG ENIM, SUMATERA SELATAN. Banda Aceh : Fakultas Teknik Universitas Syiah Kuala, 2018
Pilih :
Hal : 1 / 15


Tulisan yang relevan
OPTIMASI SUPLAI PRODUK BATUBARA KE STOCKPILE 3 DILOKASI PENAMBANGAN BANKO BARAT PT BUKIT ASAM (PERSERO) TBK TANJUNG ENIM SUMATERA SELATAN (Muhammad Zuhri Simatupang, 2017) ,   Baca Full Text... |  Abstrak..

EVALUASI JAM KERJA EFEKTIF DAN KESERASIAN KERJA ALAT GALI MUAT KOMATSU PC 800 SE DENGAN ALAT ANGKUT SCANIA P 420 PADA PENAMBANGAN BATU BARA PIT 1 TIMUR BANKO BARAT PT BUKIT ASAM (PERSERO) TBK (MUHAMMAD FADHIL, 2018) ,   Baca Full Text... |  Abstrak..

OPTIMALISASI LERENG GALIAN BANKO BARAT PIT 2 TAHUN 2016 DI PT. BUKIT ASAM (PERSERO), TBK. UNIT PERTAMBANGAN TANJUNG ENIM, PROVINSI SUMATERA SELATAN (Zati Hulwani, 2016) ,   Baca Full Text... |  Abstrak..

KAJIAN TEKNIS PRODUKSI UNIT LOADING SHOVEL KOMATSU TIPE PC3000-6E UNTUK MATERIAL OVERBURDEN PADA AREA PENAMBANGAN SATUAN UNIT ELEKTRIFIKASI PIT 3 TIMUR BANKO BARAT PT. BUKIT ASAM (PERSERO),TBK (ADHAR DEDDYANSYAH, 2019) ,   Baca Full Text... |  Abstrak..

OPTIMALISASI PERENCANAAN STRUKTUR RANGKA BAJA PADA ATAP GUDANG BATU BARA PLTU NAGAN RAYA DENGAN MENGGUNAKAN SNI PEMBEBANAN 03-1727-2013 DAN DATA SEKUNDER BMKG (Muhammad Fawzul Aziim Afif, 2016) ,   Baca Full Text... |  Abstrak..