//

PRARANCANGAN PABRIK BLEACHING EARTH (ACTIVATED CLAY) DARI CA-BENTONIT DENGAN KAPASITAS PRODUKSI 55.000 TON/TAHUN

BACA FULL TEXT ABSTRAK Permintaan Versi cetak
Pengarang Sri Ratna Dewi - Personal Name

Abstrak/Catatan

ABSTRACT The preliminary design of Bleaching earth plant provided is using ACID method with ca-bentonite as row materials, and sulfide acid. Sulfid Acidis obtained from PT.Petrokimia. the bentonite from mining at Kuala Dewa. The production capacity of this plant is 55.000 ton/year with work days of 320 days/year. The form of this company is Limited Liability Company (Ltd) and using structur of line and staff method, with total of manpower 154 people. The factory location was planned in Desa Kuala dewa, Aceh jempa, Aceh, with area of 14.050 m2. Water demand of this factory is supplied from krueng geukuh river in Aceh utara with total water demand of 45979,42 kg/hour, and electricity demand is fully supplied by diesel generator with power of 957,76 MW. From economic analysis was obtained: 1. Fixed Capital Investment (FCI) = Rp 85.556.970.763 2. Working Capital Investment (WCI) = Rp47.224.649.035 3. Total Capital Investment (TCI) = Rp 106.946.213.454 4. Total Production Cost (TPC) = Rp 188.898.596.139 5. Sales = Rp 241.455.734.418 6. Net profit = Rp 32.491.920.887 7. Pay Out Time (POT) = 2,6 tahun 8. Break-even Point (BEP) = 32%   ABSTRAK Prarancangan pabrik Bleaching earth ini menggunakan metode asam dengan bahan baku ca-bentonit, dan asam sulfat. Bahan baku diperoleh langsung dari Kuala Dewa, sedangkan asam sulfat diperoleh dari PT.Petrokimia. Kapasitas produksi pabrik ini adalah 55.000 Ton/Tahun, dengan hari kerja 320 hari/tahun. Bentuk perusahaan yang direncanakan adalah Perseroan Terbatas (PT) dengan menggunakan metode struktur garis dan staf. Kebutuhan tenaga kerja untuk menjalankan perusahaan ini berjumlah 154 orang. Lokasi pabrik direncanakan didirikan di Desa Kuala dewa, Kabupaten Aceh jempa, Kota bireun, Aceh, dengan luas tanah 14.050 m2. Sumber air pabrik ini berasal dari Sungai kruenggeukuh, Aceh utara, dengan total kebutuhan air sebesar 45979,42 kg/jam, serta untuk memenuhi kebutuhan listrik diperoleh dari Perusahaan Listrik Negara (PLN) dan generator dengan daya 957,76 KW. Hasil analisa ekonomi yang diperoleh adalah sebagai berikut : 1. Fixed Capital Investment (FCI) = Rp 85.556.970.763 2. Working Capital Investment (WCI) = Rp47.224.649.035 3. Total Capital Investment (TCI) = Rp 106.946.213.454 4. Total Production Cost (TPC) = Rp 188.898.596.139 5. Sales Cost (SC) = Rp 241.455.734.418 6. Laba Bersih = Rp 32.491.920.887 7. BEP (Break Even Point) = 32 % 8. POT (Pay Out Time) = 2,6 Tahun

Tempat Terbit
Literature Searching Service

Hard copy atau foto copy dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan isi formulir online (Chat Service LSS)

Share Social Media

Tulisan yang Relevan

PRARANCANGAN PABRIK BLEACHING EARTH (ACTIVATED CLAY) DARI CA-BENTONIT DENGAN KAPASITAS PRODUKSI 55.000 TON/TAHUN (Sri Ratna Dewi, 2018)

PRARANCANGAN PABRIK MINYAK GORENG DARI CRUDE PALM OIL (CPO) DENGAN KAPASITAS PRODUKSI 300.000 TON/TAHUN (MUHFADZALLAH, 2018)

PRARANCANGAN PABRIK MINYAK GORENG DARI CRUDE PALM OIL (CPO) DENGAN KAPASITAS PRODUKSI 300.000 TON/TAHUN PRARANCANGAN PABRIK MINYAK GORENG DARI CRUDE PALM OIL (CPO) DENGAN KAPASITAS PRODUKSI 300.000 TON/TAHUN PRARANCANGAN PABRIK MINYAK GORENG DARI CRUDE PALM OIL (CPO) DENGAN KAPASITAS PRODUKSI 300.000 TON/TAHUN (MUHAMMAD IKRAM, 2018)

PRARANCANGAN PABRIK PULP DARI KULIT KAKAO MENGGUNAKAN PROSES ORGANOSOLV DENGAN KAPASITAS BAHAN BAKU 280.000 TON/TAHUN (Lisa Aulia Lubis, 2014)

PRARANCANGAN PABRIK PULP DARI KULIT KAKAO MENGGUNAKAN PROSES ORGANOSOLV DENGAN KAPASITAS BAHAN BAKU 280.000 TON/TAHUN (Fadia Annisa, 2014)

  Kembali ke sebelumnya

Pencarian

Advance



Jenis Akses


Tahun Terbit

   

Program Studi

   

© UPT. Perpustakaan Universitas Syiah Kuala 2015     |     Privacy Policy