KAJIAN PRODUKTIVITAS DAN TARIF BIAYA ALAT MEKANIS PADA PROSES PENAMBANGAN BULAN AGUSTUS DAN SEPTEMBER TAHUN 2016 DI LOKASI TAMBANG MUARA TIGA BESAR UTARA PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM SUMATERA SELATAN

BACA FULL TEXT ABSTRAK Permintaan Versi cetak
Pengarang Muhammad Rifaldi - Personal Name
SubjectESTIMATES TIMES - BUILDING CONSTRUCTION
Bahasa Indonesia
Fakultas FAKULTAS TEKNIK UNIVERSITAS SYIAH KUALA
Tahun Terbit 2017

Abstrak/Catatan

ABSTRAK Produktivitas merupakan faktor yang sangat menentukan tercapainya produksi pada suatu kegiatan penambangan. Dalam sebuah kegiatan penambangan produktivitas juga merupakan parameter penentuan tarif biaya alat seperti alat angkut dan alat spreading. Beberapa faktor seperti jam ketersediaan alat menentukan tingkat produktivitas suatu alat mekanis. Penelitian ini bertujuan untuk mengkaji produktivitas dan tarif biaya alat sehingga ditemukan masalah-masalah yang mengakibatkan tidak tercapainya produksi dan biaya yang efektif dalam suatu kegiatan penambangan. Data yang digunakan adalah data cylce time dan data teknis penambangan batubara bulan Agustus dan September PT. Bukit Asam (Persero) Tbk. Berdasarkan hasil kajian produktivitas di lapangan ditemukan bahwa target produksi tidak tercapai sehingga menyebabkan tarif biaya menjadi tidak efektif. Pada bulan Agustus target produksi overburden sebesar 600.000 BCM dan batubara sebesar 150.000 Ton. Namun realisasi yang diperoleh berdasarkan kajian di lapangan ditemukan bahwa produksi untuk bulan Agustus tidak tercapai. Hal yang sama juga terjadi pada bulan September, dimana produksi overburden hanya mencapai 810.309,52 BCM sedangkat target sebesar 820.000 BCM. Tidak tercapainya produksi bulan Agustus dan September disebabkan oleh jam standby alat yang tinggi. Upaya optimalisasi dilakukan dengan mengurangi jam standby alat berdasarkan penyebab-penyebab terjadi jam standby dan seharusnya dapat dihindari. Tarif biaya alat mekanis pada bulan Agustus sebesar Rp 22.420,40 /BCM dan untuk bulan September sebesar Rp 25.268,82 /BCM. Kata kunci: Produktivitas, Tarif Biaya, Jam Ketersediaan Alat, Jam Standby   ABSTRACT Productivity is an important factor for the achievement of production in mining activity. Productivity also determine the cost rates of several equipments, such as hauling and spreading equipments. Some factors such as the availibility time of equipments specify the productivity rate.This research aims to assess the productivity as well as the cost rate, thus will find the cause of not achieved the target and the effectiveness of cost rate in a spesific mining job. The study based on cycle time data and other technical data of coal mining from August to September in PT. Bukit Asam (Persero), Tbk. The production target is not achieved, based on the study, and this led to the ineffectiveness of mining cost rates. The amount of 600.000 BCM overburden and 150.000 ton coals are targeted. However, the realization of which is obtained from the field it was found that the production for the month of August is not reached. It also happened in September, where the overburden production reach only 810.309,52 BCM while the target is 820.000 BCM. The too high standby hours is the cause of not achieved the production target. Reducing standby hours by minimizing the could-avoided-activities is one of the optimization technique that can be done. The cost rates of August and September respectively are Rp. 22.420,40 per BCM and Rp. 25.268,82 per BCM. Keywords: Produktivity, Cost rates, Availibility time, Standby hours

Tempat Terbit Banda Aceh
Literature Searching Service

Hard copy atau foto copy dapat diberikan dengan syarat ketentuan berlaku, jika berminat, silahkan isi formulir online (Chat Service LSS)

Share Social Media

Tulisan yang Relevan

KAJIAN PRODUKTIVITAS DAN TARIF BIAYA ALAT MEKANIS PADA PROSES PENAMBANGAN BULAN AGUSTUS DAN SEPTEMBER TAHUN 2016 DI LOKASI TAMBANG MUARA TIGA BESAR UTARA PT. BUKIT ASAM (PERSERO) TBK TANJUNG ENIM SUMATERA SELATAN (Muhammad Rifaldi, 2017)

EVALUASI JAM KERJA EFEKTIF DAN KESERASIAN KERJA ALAT GALI MUAT KOMATSU PC 800 SE DENGAN ALAT ANGKUT SCANIA P 420 PADA PENAMBANGAN BATU BARA PIT 1 TIMUR BANKO BARAT PT BUKIT ASAM (PERSERO) TBK (MUHAMMAD FADHIL, 2018)

PERENCANAAN SLEWING SHIFTING PADA JALUR BELT CONVEYOR CD 03/24 DI UNIT MUARA TIGA BESAR UTARA PT BUKIT ASAM (PERSERO), TBK (Alimnur, 2018)

KAJIAN PRODUKSI DAN BIAYA OPERASI ALAT GALI MUAT DAN ALAT ANGKUT DI PT SEMEN PADANG (PERSERO) TBK, BUKIT KARANG PUTIH INDARUNG SUMATERA BARAT (Hayatun Nufus, 2017)

KAJIAN BIAYA PENAMBANGAN DALAM MEMENUHI TARGET PRODUKSI BATU BARA DI WILAYAH PENAMBANGAN BANKO BARAT PT BUKIT ASAM (PERSERO) TBK TANJUNG ENIM SUMATERA SELATAN (YUSFAIZI ADITIA, 2018)